Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Important points selected at the ends of ...
➣ Length of transition curve for design speed ...
➣ On a horizontal curve, if the pavement ...
➣ In which of the following types of ...
➣ Maximum allowable limit upto that a measurement ...
➣ For design, that length of transition curve ...
➣ In a closed traverse : ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ A 30m chain was found to be ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Miscellaneous
➤ Surveying
➤ Concrete Technology
➤ Strength of Material
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Water Supply