Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Normal tension is that pull which : ...
➣ With referance to the Marshall mix design ...
➣ If in a Dorry abrasion test the ...
➣ The tie line is run throught the ...
➣ An offset more than 15 m length ...
➣ Limiting length of offset depends upon : ...
➣ Chainage is the distance measured : ...
➣ During chaining along straight line,the leader of ...
➣ Compensating errors in chaining are : ...
➣ For design, that length of transition curve ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Building Material