♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ When speed of traffic flow becomes zero, ...
➣ During chaining along straight line,the leader of ...
➣ The base line is measured with : ...
➣ In a braking test, a vehicle travelling ...
➣ Secular variation is important is important factor ...
➣ The effect of grade on safe overtaking ...
➣ On a right angled road inter-section with ...
➣ On the right angled road inter-section with ...
➣ Invar tapes are made of an alloy ...
➣ Negative errors are caused in chain, when ...
❖ Take a qick MCQ Test on
➤ Transportation Engineering
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Miscellaneous
➤ Surveying
➤ Building Material
➤ Pollution (Air and Noise)