♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Bitumen grade 80/100 indicates that under the ...
➣ In soil stabilisation : ...
➣ The tie line is run throught the ...
➣ The effect of grade on safe overtaking ...
➣ The entrance and exit curves of a ...
➣ In which of the following traffic signal ...
➣ A field is measured with a 1.0 ...
➣ Normal tension is that pull which : ...
➣ On a horizontal curve, if the pavement ...
➣ 30th highest hour volumes is : ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Hydrology
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Soil Mechanics and Foundation