♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The base line is measured with : ...
➣ In survey works declinations varies from time ...
➣ Number of links in a 30 m ...
➣ In desire line diagram : ...
➣ A rotary will be more suitable than ...
➣ A field is measured with a 1.0 ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ On the right angled road inter-section with ...
➣ The entrance and exit curves of a ...
➣ Which of the following is taken into ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Fluid Mechanics and Hydraulics
➤ Surveying
➤ Water Supply