Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.4K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Errors which remain after mistakes and systematic ...
➣ For design, that length of transition curve ...
➣ Chainage is the distance measured : ...
➣ True meridians : ...
➣ Positive error is caused if : ...
➣ When speed of traffic flow becomes zero, ...
➣ What is the off-tracking of a vehicle ...
➣ What is the mechanical widening required for ...
➣ The effect of grade on safe overtaking ...
➣ Most probable value of an observed quantity ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Building Material
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material
➤ Water Supply
➤ Soil Mechanics and Foundation
➤ Steel Structure