Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With increase in speed of the traffic ...
➣ The main difference between optical square and ...
➣ 30th highest hour volumes is : ...
➣ Important points selected at the ends of ...
➣ On a right angle road inter-section with ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ The effect of grade on safe overtaking ...
➣ Length of transition curve for design speed ...
➣ Positive error is caused if : ...
➣ A field is measured with a 1.0 ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Hydrology
➤ Concrete Structure