Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.5K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With referance to the Marshall mix design ...
➣ Permissible limits of error in chaining of ...
➣ Obstacle to ranging but not chaining is ...
➣ Gravity model is used in transportation planning ...
➣ The sag correction is always : ...
➣ As per IRG-recommendation, the average level of ...
➣ The tie line is run throught the ...
➣ On the right angled road inter-section with ...
➣ Drive ways aire : ...
➣ Secular variation is important is important factor ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Surveying
➤ Building Material
➤ Soil Mechanics and Foundation
➤ Water Supply
➤ Concrete Technology
➤ Transportation Engineering
➤ Steel Structure