♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
Important points selected at the ends of ...
Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.6K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Limiting length of offset depends upon : ...
➣ Positive error is caused if : ...
➣ With referance to the Marshall mix design ...
➣ Open cross staff is used for setting ...
➣ Invar tapes are made of an alloy ...
➣ Chain surveying is used for : ...
➣ In desire line diagram : ...
➣ During chaining along straight line,the leader of ...
➣ Obstacle to ranging but not chaining is ...
➣ For a constant value of co-efficient of ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Miscellaneous
➤ Concrete Structure
➤ Surveying
➤ Irrigation
➤ Building Material