Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With increase in speed of the traffic ...
➣ Chain surveying is used for : ...
➣ Important points selected at the ends of ...
➣ A field is measured with a 1.0 ...
➣ A river is an obstacle to : ...
➣ Drive ways aire : ...
➣ What is the psychological widening of pavement ...
➣ Dip of the needle : ...
➣ With referance to the Marshall mix design ...
➣ In whole circle system, the bearing are ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Miscellaneous
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics
➤ Steel Structure
➤ Hydrology