Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The closing error in a traverse is ...
➣ Gravity model is used in transportation planning ...
➣ Length of transition curve for design speed ...
➣ While aligning a hill road with a ...
➣ The optical square is based on the ...
➣ Length of a vehicle affects : ...
➣ Maximum allowable limit upto that a measurement ...
➣ Which of the following statement (s) is/are ...
➣ The effect of grade on safe overtaking ...
➣ With increase in speed of the traffic ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Concrete Structure
➤ Miscellaneous
➤ Steel Structure
➤ Water Supply
➤ Concrete Technology
➤ Hydrology
➤ Solid Waste and Waste Water Treatment