Que.
Important points selected at the ends of the chain lines to command the boundaries of the survey are called :
A.
Main stations
B.
Subsidiary stations
C.
Tie stations
D.
None of the above
Right Answer is :
✓ A. Main stations
⚑ Report
Views 👍 :1.3K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ During chaining along straight line,the leader of ...
➣ With regards to traversing : ...
➣ On a right angle road inter-section with ...
➣ In which of the following types of ...
➣ Shift of the transition curve of radius ...
➣ When speed of traffic flow becomes zero, ...
➣ What is the psychological widening of pavement ...
➣ An offset more than 15 m length ...
➣ With increase in speed of the traffic ...
➣ Length of transition curve for design speed ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Miscellaneous
➤ Surveying
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation