The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A rotary will be more suitable than ...
➣ Normal tension is that pull which : ...
➣ Inclination of the needle to the horizontal ...
➣ Secular variation is important is important factor ...
➣ The closing error in a traverse is ...
➣ On a horizontal curve, if the pavement ...
➣ The entrance and exit curves of a ...
➣ Drive ways aire : ...
➣ As per IRG-recommendation, the average level of ...
➣ Obstacle to ranging but not chaining is ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Concrete Technology
➤ Miscellaneous
➤ Water Supply
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics