Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Gravity model is used in transportation planning ...
➣ In compass surtveying : ...
➣ What is the mechanical widening required for ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ In which of the following types of ...
➣ Number of links in a 30 m ...
➣ Positive error is caused if : ...
➣ What is the psychological widening of pavement ...
➣ Maximum allowable limit upto that a measurement ...
➣ In a closed traverse : ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Irrigation
➤ Transportation Engineering
➤ Pollution (Air and Noise)
➤ Surveying
➤ Hydrology
➤ Strength of Material
➤ Fluid Mechanics and Hydraulics