The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For a constant value of co-efficient of ...
➣ Number of links in a 30 m ...
➣ In survey works declinations varies from time ...
➣ The base line is measured with : ...
➣ Length of a vehicle affects : ...
➣ Which of the following statements is/are correct ...
➣ In whole circle system, the bearing are ...
➣ Method of offset laying involving minimum measurement ...
➣ Open cross staff is used for setting ...
➣ Most probable value of an observed quantity ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Water Supply