The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Maximum allowable limit upto that a measurement ...
➣ The effect of grade on safe overtaking ...
➣ What is the psychological widening of pavement ...
➣ If free mean speed on a roadway ...
➣ Length of transition curve for design speed ...
➣ A river is an obstacle to : ...
➣ In a closed traverse : ...
➣ With referance to the Marshall mix design ...
➣ Chainage is the distance measured : ...
➣ Most probable value of an observed quantity ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Concrete Structure
➤ Water Supply
➤ Steel Structure
➤ Concrete Technology
➤ Soil Mechanics and Foundation
➤ Strength of Material
➤ Transportation Engineering