The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Which of the following statement (s) is/are ...
➣ Duirnal variation depends upon : ...
➣ As per IRG-recommendation, the average level of ...
➣ Inclination of the needle to the horizontal ...
➣ 30th highest hour volumes is : ...
➣ Errors which remain after mistakes and systematic ...
➣ With increase in speed of the traffic ...
➣ In soil stabilisation : ...
➣ Clearance distance or set back distance required ...
➣ Length of a vehicle affects : ...
❖ Take a qick MCQ Test on
➤ Water Supply
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material
➤ Hydrology
➤ Irrigation
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Steel Structure