♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Bitumen grade 80/100 indicates that under the ...
➣ Normal tension is that pull which : ...
➣ Limiting length of offset depends upon : ...
➣ In which of the following traffic signal ...
➣ The tie line is run throught the ...
➣ If average centre to centre spacing of ...
➣ Metallic tapes are made of : ...
➣ Chain surveying is used for : ...
➣ In desire line diagram : ...
➣ The sag correction is always : ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Hydrology
➤ Concrete Structure
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Miscellaneous