♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Limiting length of offset depends upon : ...
➣ The optical square is based on the ...
➣ Clearance distance or set back distance required ...
➣ In a prismatic compass : ...
➣ The position of point can be fixed ...
➣ The chain length which is not the ...
➣ Quadrantal system confines the user to measure ...
➣ In desire line diagram : ...
➣ Length of summit curve for a stopping ...
➣ What is the psychological widening of pavement ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Steel Structure
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment
➤ Concrete Structure
➤ Building Material