♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For detecting whether a bitumen is cracked ...
➣ Which of the following is taken into ...
➣ In a closed traverse : ...
➣ Negative errors are caused in chain, when ...
➣ As per IRG-recommendation, the average level of ...
➣ Drive ways aire : ...
➣ What is the mechanical widening required for ...
➣ In soil stabilisation : ...
➣ Dip of the needle : ...
➣ In a prismatic compass : ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Soil Mechanics and Foundation