The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If free mean speed on a roadway ...
➣ The optical square is based on the ...
➣ A building is an obstacles to : ...
➣ Inclination of the needle to the horizontal ...
➣ What is the mechanical widening required for ...
➣ What is the off-tracking of a vehicle ...
➣ In soil stabilisation : ...
➣ Open cross staff is used for setting ...
➣ With increase in speed of the traffic ...
➣ An offset more than 15 m length ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Miscellaneous
➤ Pollution (Air and Noise)
➤ Surveying
➤ Transportation Engineering