♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Positive error is caused if : ...
➣ Maximum allowable limit upto that a measurement ...
➣ On the right angled road inter-section with ...
➣ What is the off-tracking of a vehicle ...
➣ Negative errors are caused in chain, when ...
➣ Inclination of the needle to the horizontal ...
➣ Method of offset laying involving minimum measurement ...
➣ While aligning a hill road with a ...
➣ The position of point can be fixed ...
➣ What is the psychological widening of pavement ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics
➤ Surveying
➤ Pollution (Air and Noise)
➤ Concrete Technology
➤ Hydrology
➤ Water Supply