The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With increase in speed of the traffic ...
➣ Metallic tapes are made of : ...
➣ A field is measured with a 1.0 ...
➣ Clearance distance or set back distance required ...
➣ Which of the following statement (s) is/are ...
➣ Positive error is caused if : ...
➣ On a right angled road inter-section with ...
➣ A 30m chain was found to be ...
➣ The tie line is run throught the ...
➣ What is the psychological widening of pavement ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Concrete Structure
➤ Hydrology
➤ Surveying
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Steel Structure
➤ Miscellaneous