The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Compensating errors in chaining are : ...
➣ Normal tension is that pull which : ...
➣ A rotary will be more suitable than ...
➣ What is the psychological widening of pavement ...
➣ On a right angle road inter-section with ...
➣ In which of the following traffic signal ...
➣ With referance to the Marshall mix design ...
➣ A building is an obstacles to : ...
➣ Drive ways aire : ...
➣ Which of the following statements is/are correct ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment
➤ Transportation Engineering
➤ Steel Structure
➤ Concrete Structure
➤ Water Supply
➤ Strength of Material