Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Method of offset laying involving minimum measurement ...
➣ What is the off-tracking of a vehicle ...
➣ If a vehicle travelling at 40 kmph ...
➣ As per IRG-recommendation, the average level of ...
➣ A 30m chain was found to be ...
➣ With referance to the Marshall mix design ...
➣ In compass surtveying : ...
➣ A rotary will be more suitable than ...
➣ For design, that length of transition curve ...
➣ If free mean speed on a roadway ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Miscellaneous
➤ Water Supply
➤ Steel Structure
➤ Concrete Technology
➤ Building Material