The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Open cross staff is used for setting ...
➣ The main difference between optical square and ...
➣ What is the psychological widening of pavement ...
➣ Most probable value of an observed quantity ...
➣ In soil stabilisation : ...
➣ Clearance distance or set back distance required ...
➣ In compass surtveying : ...
➣ Method of offset laying involving minimum measurement ...
➣ Limiting length of offset depends upon : ...
➣ As per IRG-recommendation, the average level of ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Strength of Material
➤ Concrete Structure
➤ Pollution (Air and Noise)
➤ Hydrology
➤ Soil Mechanics and Foundation
➤ Building Material