♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Drive ways aire : ...
➣ If free mean speed on a roadway ...
➣ For detecting whether a bitumen is cracked ...
➣ Which of the following is taken into ...
➣ As per IRG-recommendation, the average level of ...
➣ In a closed traverse : ...
➣ Errors which remain after mistakes and systematic ...
➣ Maximum allowable limit upto that a measurement ...
➣ A 30m chain was found to be ...
➣ In survey works declinations varies from time ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Concrete Technology
➤ Surveying
➤ Transportation Engineering
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Concrete Structure
➤ Soil Mechanics and Foundation