The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Inclination of the needle to the horizontal ...
➣ A rotary will be more suitable than ...
➣ If ruling gradients is 1 in 20 ...
➣ The tie line is run throught the ...
➣ Length of summit curve for a stopping ...
➣ The best binder material to be used ...
➣ The chain length which is not the ...
➣ What is the psychological widening of pavement ...
➣ Metallic tapes are made of : ...
➣ With increase in speed of the traffic ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Steel Structure
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Transportation Engineering
➤ Strength of Material
➤ Water Supply
➤ Solid Waste and Waste Water Treatment