The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Important points selected at the ends of ...
➣ Positive error is caused if : ...
➣ A field is measured with a 1.0 ...
➣ When speed of traffic flow becomes zero, ...
➣ For a constant value of co-efficient of ...
➣ With referance to the Marshall mix design ...
➣ The closing error in a traverse is ...
➣ A vehicle moving at 40 kmph speed ...
➣ If ruling gradients is 1 in 20 ...
➣ Drive ways aire : ...
❖ Take a qick MCQ Test on
➤ Concrete Technology
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Steel Structure
➤ Concrete Structure
➤ Hydrology
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment