Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If average centre to centre spacing of ...
➣ 30th highest hour volumes is : ...
➣ In which of the following traffic signal ...
➣ True meridians : ...
➣ For design, that length of transition curve ...
➣ In a closed traverse : ...
➣ Secular variation is important is important factor ...
➣ Compensating errors in chaining are : ...
➣ A field is measured with a 1.0 ...
➣ The main difference between optical square and ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Pollution (Air and Noise)
➤ Concrete Structure
➤ Hydrology
➤ Concrete Technology
➤ Miscellaneous
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment