The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Drive ways aire : ...
➣ Compensating errors in chaining are : ...
➣ If a vehicle travelling at 40 kmph ...
➣ Secular variation is important is important factor ...
➣ The base line is measured with : ...
➣ Open cross staff is used for setting ...
➣ The tie line is run throught the ...
➣ The position of point can be fixed ...
➣ For a constant value of co-efficient of ...
➣ Prismatic compass and surveyor's compass respectively given ...
❖ Take a qick MCQ Test on
➤ Hydrology
➤ Irrigation
➤ Building Material
➤ Strength of Material
➤ Water Supply
➤ Concrete Technology
➤ Steel Structure
➤ Concrete Structure