♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Invar tapes are made of an alloy ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ Secular variation is important is important factor ...
➣ What is the off-tracking of a vehicle ...
➣ A vehicle moving at 40 kmph speed ...
➣ If ruling gradients is 1 in 20 ...
➣ In survey works declinations varies from time ...
➣ Normal tension is that pull which : ...
➣ Metallic tapes are made of : ...
➣ In whole circle system, the bearing are ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Steel Structure
➤ Irrigation
➤ Water Supply
➤ Concrete Technology
➤ Hydrology
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment