♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ What is the psychological widening of pavement ...
➣ The entrance and exit curves of a ...
➣ The tie line is run throught the ...
➣ In desire line diagram : ...
➣ On the right angled road inter-section with ...
➣ Length of summit curve for a stopping ...
➣ If free mean speed on a roadway ...
➣ 30th highest hour volumes is : ...
➣ In which of the following traffic signal ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment
➤ Building Material
➤ Concrete Technology
➤ Fluid Mechanics and Hydraulics
➤ Strength of Material