Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Method of offset laying involving minimum measurement ...
➣ If in a Dorry abrasion test the ...
➣ For accurate work,in comparison to chain, the ...
➣ A 30m chain was found to be ...
➣ For detecting whether a bitumen is cracked ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ The closing error in a traverse is ...
➣ Positive error is caused if : ...
➣ When speed of traffic flow becomes zero, ...
➣ Secular variation is important is important factor ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Building Material
➤ Water Supply
➤ Steel Structure
➤ Pollution (Air and Noise)
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Surveying