The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ With referance to the Marshall mix design ...
➣ For a constant value of co-efficient of ...
➣ With regards to traversing : ...
➣ Obstacle to ranging but not chaining is ...
➣ A negative declination shows the magnetic meridian ...
➣ Drive ways aire : ...
➣ On a horizontal curve, if the pavement ...
➣ Length of a vehicle affects : ...
➣ Maximum allowable limit upto that a measurement ...
➣ The effect of grade on safe overtaking ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Miscellaneous
➤ Soil Mechanics and Foundation
➤ Transportation Engineering
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Steel Structure