♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ As per IRG-recommendation, the average level of ...
➣ The chain length which is not the ...
➣ Maximum allowable limit upto that a measurement ...
➣ For a constant value of co-efficient of ...
➣ Compensating errors in chaining are : ...
➣ What is the psychological widening of pavement ...
➣ During chaining along straight line,the leader of ...
➣ The sag correction is always : ...
➣ Obstacle to ranging but not chaining is ...
➣ Quadrantal system confines the user to measure ...
❖ Take a qick MCQ Test on
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Water Supply
➤ Hydrology
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Building Material