The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ For a constant value of co-efficient of ...
➣ Length of a vehicle affects : ...
➣ Which of the following statement (s) is/are ...
➣ With increase in speed of the traffic ...
➣ On a horizontal curve, if the pavement ...
➣ The main difference between optical square and ...
➣ Compensating errors in chaining are : ...
➣ Which of the following is taken into ...
➣ With increase in speed of the traffic ...
➣ During chaining along straight line,the leader of ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Miscellaneous
➤ Steel Structure
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Surveying
➤ Strength of Material