The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ As per IRG-recommendation, the average level of ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ With referance to the Marshall mix design ...
➣ The tie line is run throught the ...
➣ A vehicle moving at 40 kmph speed ...
➣ Errors which remain after mistakes and systematic ...
➣ For accurate work,in comparison to chain, the ...
➣ The closing error in a traverse is ...
➣ What is the mechanical widening required for ...
➣ For detecting whether a bitumen is cracked ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Miscellaneous
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)
➤ Building Material
➤ Hydrology
➤ Concrete Technology
➤ Water Supply