Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If free mean speed on a roadway ...
➣ Obstacle to ranging but not chaining is ...
➣ If a vehicle travelling at 40 kmph ...
➣ In which of the following traffic signal ...
➣ A building is an obstacles to : ...
➣ On a right angled road inter-section with ...
➣ With regards to traversing : ...
➣ While aligning a hill road with a ...
➣ In a braking test, a vehicle travelling ...
➣ The position of point can be fixed ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Concrete Technology
➤ Concrete Structure
➤ Surveying
➤ Transportation Engineering
➤ Miscellaneous
➤ Solid Waste and Waste Water Treatment
➤ Fluid Mechanics and Hydraulics