Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ A field is measured with a 1.0 ...
➣ What is the psychological widening of pavement ...
➣ If a vehicle travelling at 40 kmph ...
➣ True meridians : ...
➣ Secular variation is important is important factor ...
➣ On a right angle road inter-section with ...
➣ Which of the following statement (s) is/are ...
➣ A negative declination shows the magnetic meridian ...
➣ For design, that length of transition curve ...
➣ Positive error is caused if : ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Solid Waste and Waste Water Treatment
➤ Water Supply
➤ Irrigation
➤ Strength of Material
➤ Miscellaneous