The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Most probable value of an observed quantity ...
➣ What is the off-tracking of a vehicle ...
➣ Shift of the transition curve of radius ...
➣ With referance to the Marshall mix design ...
➣ In a prismatic compass : ...
➣ In which of the following traffic signal ...
➣ On a horizontal curve, if the pavement ...
➣ In which of the following types of ...
➣ A building is an obstacles to : ...
➣ A 30m chain was found to be ...
❖ Take a qick MCQ Test on
➤ Surveying
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Irrigation
➤ Transportation Engineering
➤ Building Material
➤ Concrete Structure
➤ Fluid Mechanics and Hydraulics