♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ If a vehicle travelling at 40 kmph ...
➣ In which of the following traffic signal ...
➣ For a constant value of co-efficient of ...
➣ While aligning a hill road with a ...
➣ In which of the following types of ...
➣ Normal tension is that pull which : ...
➣ Prismatic compass and surveyor's compass respectively given ...
➣ In a braking test, a vehicle travelling ...
➣ Permissible limits of error in chaining of ...
➣ The best binder material to be used ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Building Material
➤ Transportation Engineering
➤ Surveying
➤ Pollution (Air and Noise)
➤ Strength of Material
➤ Steel Structure
➤ Solid Waste and Waste Water Treatment