The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The effect of grade on safe overtaking ...
➣ Bitumen grade 80/100 indicates that under the ...
➣ Negative errors are caused in chain, when ...
➣ Which of the following is taken into ...
➣ Positive error is caused if : ...
➣ In survey works declinations varies from time ...
➣ Duirnal variation depends upon : ...
➣ Length of a vehicle affects : ...
➣ A building is an obstacles to : ...
➣ The base line is measured with : ...
❖ Take a qick MCQ Test on
➤ Irrigation
➤ Surveying
➤ Building Material
➤ Steel Structure
➤ Hydrology
➤ Water Supply
➤ Pollution (Air and Noise)
➤ Solid Waste and Waste Water Treatment