♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ In which of the following traffic signal ...
➣ Gravity model is used in transportation planning ...
➣ Limiting length of offset depends upon : ...
➣ On a right angled road inter-section with ...
➣ For detecting whether a bitumen is cracked ...
➣ In which of the following types of ...
➣ If in a Dorry abrasion test the ...
➣ The position of point can be fixed ...
➣ For accurate work,in comparison to chain, the ...
➣ The closing error in a traverse is ...
❖ Take a qick MCQ Test on
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Irrigation
➤ Steel Structure
➤ Strength of Material
➤ Transportation Engineering
➤ Fluid Mechanics and Hydraulics
➤ Pollution (Air and Noise)