The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.8K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ What is the psychological widening of pavement ...
➣ Which of the following statements is/are correct ...
➣ In whole circle system, the bearing are ...
➣ In compass surtveying : ...
➣ For design, that length of transition curve ...
➣ Metallic tapes are made of : ...
➣ Chain surveying is used for : ...
➣ Duirnal variation depends upon : ...
➣ Permissible limits of error in chaining of ...
➣ For detecting whether a bitumen is cracked ...
❖ Take a qick MCQ Test on
➤ Steel Structure
➤ Concrete Technology
➤ Surveying
➤ Pollution (Air and Noise)
➤ Irrigation
➤ Concrete Structure
➤ Soil Mechanics and Foundation
➤ Solid Waste and Waste Water Treatment