The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.7K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The tie line is run throught the ...
➣ What is the mechanical widening required for ...
➣ Which of the following statements is/are correct ...
➣ When speed of traffic flow becomes zero, ...
➣ In soil stabilisation : ...
➣ In survey works declinations varies from time ...
➣ Obstacle to ranging but not chaining is ...
➣ A 30m chain was found to be ...
➣ Invar tapes are made of an alloy ...
➣ For detecting whether a bitumen is cracked ...
❖ Take a qick MCQ Test on
➤ Fluid Mechanics and Hydraulics
➤ Soil Mechanics and Foundation
➤ Miscellaneous
➤ Surveying
➤ Concrete Technology
➤ Building Material
➤ Transportation Engineering
➤ Irrigation