♡ Login
Home
Previous Papers
★
MCQs
Civil Engineering
Transportation Engineering
The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ The main difference between optical square and ...
➣ In whole circle system, the bearing are ...
➣ A building is an obstacles to : ...
➣ A field is measured with a 1.0 ...
➣ With increase in speed of the traffic ...
➣ In survey works declinations varies from time ...
➣ Chain surveying is used for : ...
➣ Open cross staff is used for setting ...
➣ Length of summit curve for a stopping ...
➣ Secular variation is important is important factor ...
❖ Take a qick MCQ Test on
➤ Building Material
➤ Transportation Engineering
➤ Soil Mechanics and Foundation
➤ Strength of Material
➤ Irrigation
➤ Miscellaneous
➤ Water Supply
➤ Hydrology