The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Maximum allowable limit upto that a measurement ...
➣ Chain surveying is used for : ...
➣ A negative declination shows the magnetic meridian ...
➣ In a braking test, a vehicle travelling ...
➣ A field is measured with a 1.0 ...
➣ The base line is measured with : ...
➣ Secular variation is important is important factor ...
➣ Clearance distance or set back distance required ...
➣ Compensating errors in chaining are : ...
➣ Important points selected at the ends of ...
❖ Take a qick MCQ Test on
➤ Soil Mechanics and Foundation
➤ Concrete Technology
➤ Strength of Material
➤ Solid Waste and Waste Water Treatment
➤ Pollution (Air and Noise)
➤ Fluid Mechanics and Hydraulics
➤ Surveying
➤ Transportation Engineering