The tie line is run throught the ...
Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ Secular variation is important is important factor ...
➣ If a vehicle travelling at 40 kmph ...
➣ 30th highest hour volumes is : ...
➣ With increase in speed of the traffic ...
➣ Method of offset laying involving minimum measurement ...
➣ Which of the following statement (s) is/are ...
➣ Negative errors are caused in chain, when ...
➣ Obstacle to ranging but not chaining is ...
➣ Positive error is caused if : ...
➣ Dip of the needle : ...
❖ Take a qick MCQ Test on
➤ Strength of Material
➤ Transportation Engineering
➤ Steel Structure
➤ Fluid Mechanics and Hydraulics
➤ Solid Waste and Waste Water Treatment
➤ Hydrology
➤ Pollution (Air and Noise)
➤ Water Supply