Que.
The tie line is run throught the survey to :
A.
take off sets for detailed of nearby objects
B.
take details of nearby objects
C.
check accuracy of work
D.
none of these
Right Answer is :
✓ B. take details of nearby objects
⚑ Report
Views 👍 :1.9K
Share :
Copy ☍
✒ To discuss this topic
Comment
✕ Cancel
➤ Post Comment
❖ Related Questions
➣ On a right angle road inter-section with ...
➣ A rotary will be more suitable than ...
➣ What is the off-tracking of a vehicle ...
➣ Clearance distance or set back distance required ...
➣ In a closed traverse : ...
➣ The position of point can be fixed ...
➣ Inclination of the needle to the horizontal ...
➣ In whole circle system, the bearing are ...
➣ On a horizontal curve, if the pavement ...
➣ The best binder material to be used ...
❖ Take a qick MCQ Test on
➤ Solid Waste and Waste Water Treatment
➤ Soil Mechanics and Foundation
➤ Fluid Mechanics and Hydraulics
➤ Concrete Technology
➤ Strength of Material
➤ Miscellaneous
➤ Surveying
➤ Irrigation